Lots of love to bring this beauty back to life
/People often ask how long does it take to paint a room
Around 180 hours was put in to prep and repaint this main bedroom, ensuite ceiling + window and a small walk through area with 6 doors, ceiling and skylight.
when we started peeling back paint this is what can happen. There has been issues with water and possible rising damp. Those dark coloured dots are black mould and that is very bad. Not great to be sleeping in an environment with this stuff....
Loose plaster had to be removed
The ceiling was covered with lining paper to cover some of the issues with cracks. All the paper came off very easily. So we replastered the entire ceiling back to original condition, well pretty dam close 👍🏼
Finally the finished project
First room room completed about 6 to go 😊